Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13655750
| No.13655750
- Product Categories
- Friendly Links
- home > Supply > Jining Liangshan air system to do what the new air system | Hirono Environmental Engineering (certified merchants)
Jining Liangshan air system to do what the new air system | Hirono Environmental Engineering (certified merchants)
| Information Name: | Jining Liangshan air system to do what the new air system | Hirono Environmental Engineering (certified merchants) |
| Published: | 2015-02-12 |
| Validity: | 0 |
| Specifications: | Limited |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | New wind system-wide application of the new air system is based on one side in a closed room with special equipment to send fresh air into the room, and then the other side is discharged to the outside by a special device, the principle in the room will form the "new wind flow field" to meet the interior fresh air ventilation needs. Embodiments are: the use of high flow, low-power centrifugal fan, rely on mechanical strength from one side to the indoor air, the exhaust from the other side with a new fan designed discharged to the outside to form a new way of forced air flow field in the system. In the air, while the indoor air entering into a new air filter, Drugs, sterilization, oxygen. After the host with the new exhaust air heat recovery exchange, recovering most of the energy back through the fresh air indoors. The formation of large-scale borrowing clean space program, to ensure access to the indoor air is clean. In order to achieve the purpose of indoor air purification environment. The new air system Application: Any activity in which someone for a long time, and a poorly ventilated room is necessary to use the new air system. To sum up, household air system (negative pressure ventilation mode) suitable for use in ACH fewer apartments, villas, baby room and other small space places; for more human activity, the number of ventilators more hotels, KTV , Internet cafes and other entertainment venues, rooms, hotels, shopping malls, factories, office buildings, restaurants, banks, classrooms, nursery, hospital wards and other places, it is best to use the new air unit, because the number of ventilators and more, the energy loss and more, the need to use fresh air heat recovery system. Installation process 1, the first host power cord from the switch box; using 1.5mm ^ 2 copper wire power cord when no special requirements. 2, with screw lifting the host to the specified location, requiring regular, flat, stable. 3, with air conditioning, electricity and water pipelines and other facilities, staff communication, pipeline flow once again to determine the site or not, whether the outlet location impact on other facilities, fine-tuning of the drawing. 4, the installation of new piping systems installed wind systems, setting a hard tube every 150cm Elevators, smooth vertical and horizontal piping requirements Jining brand new air system, each wipe PVC glue joints. Pipeline in the area of ??the hose, 70cm set every single elevator, elevator bolts using the whole tooth bolts. 5. Under the takeover and ceiling-mounted air flush-type outlet side flush with the wall, do not cut the nozzle after the installation is complete, the last direct vent installation. 6, the connecting pipe with the host; connecting piping projects selected host choice between inlet and outlet reducers or funnel head size, the seams with fixed viscose fabric with foil, requirements: taped flat, not wrinkled fresh air system calls, you want to paste the seams tight, not leakage, junction foil fixed tie required. 7, between the host and the exhaust port to see if the increase in accordance with the drawings marked oblique tee, leaving the exhaust vents for ventilation fans. 8, the host with the piping system is installed, and the site electrician, would require cable and switch mounting position determination, phone tracking. 9, the host and piping installed after communication with the site carpentry, installation and maintenance proposed port data, location and call tracking. 10, if the window is installed ban, also in the host and piping installed after the request to the relevant staff to communicate and call tracking. 11. Upon completion of the main decoration, air travel and the host installation work to be checked. Jining Liangshan air system to do what the new air system | Hirono Environmental Engineering (certified merchants) provided by the Shandong Environmental Engineering Co. Hirono. Hirono Shandong Environmental Engineering Co. (www.zdhjgc.com) to provide "fresh air system, central vacuum, central water, central air conditioning, floor and ceiling radiation and board" business, the company has "Cinderella, Panasonic, ambitious, Gree, Daikin "and other brands. Focus on the fans, ventilation equipment and other industries, have higher visibility in Jining. Welcomes inquiries, contact: Dingjing Li. |
Admin>>>
You are the 15674 visitor
Copyright © GuangDong ICP No. 10089450, Hirono Environmental Engineering Co., Ltd. Shandong All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 15674 visitor
Copyright © GuangDong ICP No. 10089450, Hirono Environmental Engineering Co., Ltd. Shandong All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

